Kajian Teknis Kebutuhan Genset sebagai Sumber Energi Cadangan di UNTAG Surabaya
DOI:
https://doi.org/10.61132/mars.v2i4.225Keywords:
Distribution of electrical energy, generator back-up system, generatorAbstract
To fulfil the needs of electricity, UNTAG Surabaya Building uses electrical energy derived from PLN. But, the provision of electrical energy from PLN unable to constantly supply electrical energy without interruption. So, to overcome it, it’s obligatory to have an electrical energy back-up system in the form of a Genset so electrical energy for building needs is preserved. The Genset works automatically, so when PLN's electrical energy goes out, the generator will immediately work. Conversely, if PLN's electrical energy back to normal, the generator will stop working. Because the electrical energy back-up system at UNTAG Surabaya has been working for really long, it’s obligatory to evaluate also re-analyze the generator back-up system. The analysis is carried out by performing calculations assisted by the ETAP simulation program. For generator efficiency, it is still quite good, which is only 68.25%., because the generator only supplies loads that are an urgent priority. From the simulation results, the load must be provide by the generator is 273.04kW/341.3kVA and the generator capacity used is 400kW/500kVA. In that case, the performance of the genset is still within the limits of its capabilities.
References
Faruq, U. (2021). Analisa aliran daya pada sistem tenaga listrik menggunakan ETAP 12.6. SainETIN, 6(1), 16–22. https://doi.org/10.31849/sainetin.v6i1.7031
Hartantrie, R. C., Lesmana, I. G. E., A. R. T. K., Rahman, R. A., & Agung, N. (2022). Motor bakar pada mesin konversi energi.
Kurniawan, R. S. (2018). Analisa penggunaan genset di UNTAG Surabaya sebagai energi alternatif untuk manajemen energi. Available online at http://repository.UNTAG-sby.ac.id/id/eprint/1047 http://repository.UNTAG-sby.ac.id/1047/8/JURNAL.pdf
Naibaho, N. (2022). Analisa utilisasi genset kapasitas 275 kVA di RSUD Kebayoran Baru. Haaretz, 10(8.5.2017), 2003–2005. Available online at www.aging-us.com
Naibaholo, N., & Yoverly, M. (2022). Analisa perhitungan kebutuhan genset Stamford 670 KVA pada Apartemen Mustika Golf Residence Cikarang Jawa Barat. Jurnal Elektro, 10(1), 11–19.
Riswanto, R. (2021). Analisis evaluasi kapasitas genset sebagai sistem back-up energi listrik PT. Unilever Indonesia. Jurnal Elektro.
Safe’i, M. (2000). Analisis evaluasi kapasitas genset sebagai sistem back-up energi listrik di Gedung Jogjatronik Mall Yogyakarta. Available online at https://repository.umy.ac.id/bitstream/handle/123456789/21059/NASKAH%20PUBLIKASI.pdf?sequence=13&isAllowed=y
Tirthana, R. I. (2022). Estimation of 1500 KVA genset fuel consumption to load changes at Islam Sultan Agung Hospital Semarang. Final project proposed to complete the requirement to obtain a.
Wati, E. K. (2020). Aplikasi manajemen & efisiensi energi (Vol. 1).
Wijaya, D. N. A. K. (2022). Analisa efisiensi kinerja generator G-101 pada pembangkit listrik tenaga panas bumi. Transistor: Jurnal Elektro dan Informatika, 4(1), 43–48.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Mars : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.